Osprey Platform Production Tie-In Design
Forest Oil Corporation

Osprey Platform Leg Room #2 Production Tie-In Design
Project Location: Cook Inlet, Alaska
Detailed design document preparation for tie-in of production from seven oil production wells associated with Forest's Redoubt Shoals unit. Scope included high pressure pipe routing, analysis and design of pressures relief system, structural support and access platform design, and preparation of electrical connection details for electrical submersible pumps in each production well.








