Neutralization Pit

Neutralization Pit
Customer: Amgen
Project Location: Thousand Oaks, California
Detailed design for B7 neutralization pit involving a two-chamber system with dual variable-speed pumps to transfer effluent from the existing sump to the new above-grade skid.
The skid feed, discharge, drain, and vent piping, as well as drain overflow, compressed air, and industrial cold-water piping were designed and installed. It was also necessary to install a new foundation, containment berm, and canopy.








