Automation engineer

386 MW peaking power plant
rio_pro.jpg
Automation engineering
Customer: Fortune 100 energy company
Project Location: Rio de Janeiro, Brazil

Responsibilities included the design, commission and startup of the balance of plant control system. Harris Group assisted with the engineering design of termination and interconnecting drawings and programmed the natural gas flow computer (Fisher ROC) and gas chromatograph to record and log data. We reprogrammed the gas compressor PLC package for automatic control and designed, programmed and started up the plant's raw water intake control system. This project featured:

Foxboro DCS

Allen-Bradley and GE PLC's

Wonderware and Panelview interface to GE LM6000 Mark VI controls